Intel renames nodes: 10nm+ and 7nm become Intel 7 and 4
Processes at Intel will no longer be measured in nanometers. To differentiate itself from rivals, the company is adopting new names that are intended to provide a "clearer picture." As a result, Intel's upcoming 10nm+ and 7nm nodes will be named Intel 7 and 4.
Intel 7 is the new name for 10nm Enhanced SuperFin, which Intel previously called SuperFin. Intel's 10nm SuperFin process, used in Tiger Lake processors, has been improved. A performance gain per watt of 10 to 15 percent over 10nm SuperFin has been achieved with Intel's 7-nanometer process, which is now in volume production.
Alder Lake CPUs for desktops and laptops will be available this year, made with Intel's 7-process technology.
Intel renames its upcoming 7nm process Intel 4 to avoid confusion with its predecessor, Intel 3. Intel will use euv in production for the first time. About 20 percent more performance per watt than Intel 7 is expected with this generation. Products should appear in 2023 if production begins in the second half of 2022. Granite Rapids for data centers and Meteor Lake processors for consumers. An 18 percent increase in performance per watt is expected with Intel 3, thanks to the addition of euv layers and FinFET optimizations. A new Intel node is planned for the second half of 2023.
Intel | TSMC | Samsung | |||
10nm | 10nm | 7nm | 10nm (LPP) | 7nm | |
Gate pitch | 54nm | 66nm | 57nm | 64nm | 54nm |
metal pitch | 36nm | 44nm | 40nm | 44nm | 36nm |
Fin pitch | 34nm | 36nm | 30nm | 42nm | 27nm |
Comparison of three reference pitches, the minimum distance between two parts, in processes from Intel, TSMC and Samsung.
Intel releases 35W Intel Core i9-11900T and Core i7-11700T Rocket lake procs (with 115W PL2) - 04/27/2021 09:50 AM
Next to K (unlocked) and F (disabled iGPU) models, Intel also has the T series (low energy) processors. And for the Rocket generation that means low power (well somewhat) 35W TDP rated processors....
Intel Reports First-Quarter 2021 Financial Results - 04/23/2021 07:21 AM
Intel Corporation today reported first-quarter 2021 financial results. "Intel delivered strong first-quarter results driven by exceptional demand for our leadership products and outstanding exec...
Intel Re-Confirms March 30 for Rocket Lake-S Launch - 03/03/2021 09:22 AM
While Intel had not even briefed media just yet, Core 11000 series processors were already selling in various countries in the EU. In a small statement, Intel has now re-confirmed the new Rocket Lake-...
Introducing Intel RealSense ID Facial Authentication - 01/06/2021 07:49 PM
Intel introduced Intel RealSense ID, an on-device solution that combines an active depth sensor with a specialized neural network designed to deliver secure, accurate and user-aware facial authenticat...
Intel Releases the NUC M15 Laptop Kit - 11/20/2020 08:47 AM
The Intel NUC M15 Laptop Kit (formerly code-named "Bishop County") brings Intel's technical expertise to the whitebook market, with the goal of providing Intel's channel customers with a...
Senior Member
Posts: 15716
Joined: 2018-03-21
"What process do you use?"
"4"
"4 nm?"
"No just 4"
"Which is what?"
"7 nm actually"
"But you call it "4"?"
"Yes, it gives a clearer picture"
https://wccftech.com/intel-process-node-roadmap-new-naming-scheme-intel-7-4-3-20a-beyond-2024/
Senior Member
Posts: 3122
Joined: 2008-01-06
Bought time they renamed their process nodes to match what TSMC are doing
Senior Member
Posts: 6884
Joined: 2013-02-05
Senior Member
Posts: 965
Joined: 2012-11-28
They can call it whatever they want. I couldn't care less as long as they deliver on their proposed timeline. It's that part they seem to have a problem with, and perhaps they should focus on that, rather than marketing.
Senior Member
Posts: 6884
Joined: 2013-02-05
This is just muddying the waters.
Now these companies will just throw out random numbers, to pretend they are in the lead.
Tech savvy people, like most in this forum, can read through the BS.
But most consumers will be fooled by this.